Everything you need to know before starting a project with us.

Quick Facts

Location

Fort Atkinson, WI

Years of Service

30+

Employees

75-80

Facility Size

50,000+ ft²
(4560+ m²)

Engineering Capacity

50,000 hr/yr

Production Capacity

90,000 hr/yr

Overhead Crane Capacity

10 ton
(9000 kg)

Under Hook Crane Height

30 ft
(9.5 m)

Wet Test Areas

Multiple

Our Facility

We began operating from our current building in 2003. The 51,000 square foot facility was designed to support state-of-the-art services for our clients.

Our fabrication floor includes over 41,000 square feet of manufacturing space carefully designed to exceed the expectations of pharmaceutical customers.

In 2016, IPEC celebrated its 20th Anniversary with a facility expansion. The addition increased manufacturing space and roof height allowing us to manufacture complete systems taller than previously possible.

Our multiple wet test areas provide ample space and utilities for factory acceptance testing (FAT) and other pre-validation services.

Our fabrication areas include multiple customer conference rooms, designed to provide comfort and convenience for our visitors.

History

1996

Inception

IPEC was founded in 1996 in Fort Atkinson, WI to serve the food and dairy industry.

2000

Biotechnology Services

In 2001 our scope of services were expanded by completing procedures and specifications required to serve pharmaceutical and biotech markets.

2003

Relocation

We relocated to our current building in 2003. The 51,000 square foot facility was designed to support state-of-the-art services for our clients and their respective industries.

2016

Expansion

In 2016, IPEC celebrated its 20th Anniversary with a facility expansion. The addition increased manufacturing space and roof height allowing us to manufacture complete & upright systems taller than previously possible.

Your Process Your Design


© Integrated Process Engineers & Constructors, Inc. All rights reserved.

1901 Allen Drive
Fort Atkinson, WI 53538 USA