We began operating from our current building in 2003. The 51,000 square foot facility was designed to support state-of-the-art services for our clients.
Our fabrication floor includes over 41,000 square feet of manufacturing space carefully designed to exceed the expectations of pharmaceutical customers.
In 2016, IPEC celebrated its 20th Anniversary with a facility expansion. The addition increased manufacturing space and roof height allowing us to manufacture complete systems taller than previously possible.
Our multiple wet test areas provide ample space and utilities for factory acceptance testing (FAT) and other pre-validation services.
Our fabrication areas include multiple customer conference rooms, designed to provide comfort and convenience for our visitors.
History
1996
Inception
IPEC was founded in 1996 in Fort Atkinson, WI to serve the food and dairy industry.
2000
Biotechnology Services
In 2001 our scope of services were expanded by completing procedures and specifications required to serve pharmaceutical and biotech markets.
2003
Relocation
We relocated to our current building in 2003. The 51,000 square foot facility was designed to support state-of-the-art services for our clients and their respective industries.
2016
Expansion
In 2016, IPEC celebrated its 20th Anniversary with a facility expansion. The addition increased manufacturing space and roof height allowing us to manufacture complete & upright systems taller than previously possible.